Financial Requirements for the Provision/Upkeep of Adequate Physical
Infrastructure at Al-Mawrid
Al-Mawrid – Institute of Islamic Sciences was initiated in
the year 1983. In its initial stages, the operations of Al-Mawrid were
restricted to one or a few rooms in the residence of its founder, Javed Ahmad
Ghamidi. In the year 1991, a house in the locality of Model Town, Lahore was
acquired on rent to house the growing requirements of the Institute.
Nevertheless, two years before the turn of the century, the rented area became
inadequate for the purpose and, subsequently, the Board of Trustees raised
sufficient funds to finance (over Rs. 10 million) the purchase of a
double-storied house with two big halls – one on each story – and eight above
average-sized rooms.
Al-Mawrid is now housed at 51-K, Model Town Lahore, the
house that was purchased by its Board of Trustees. However, because this house
was not originally built to meet the specific requirements of a modern institute
of research and education, significant alterations and additions have to be
continually made to its internal structure, bringing it inline with the
requirements of the institute housed in it. Some of the major projects for which
significant amounts of financial resources had to be spent include:
·
Installation of higher capacity power supply
cables for the institute;
·
Installation of networking cables for computer
resource sharing within the institute;
·
Installation of Telephone extension cables;
·
Conversion of lower Hall into a
library-cum-seminar room and furnishing it;
·
Air-Conditioning of most of the lower floor and
part of the upper floor;
·
Alteration of faulty staircase (considered
dangerous due to its original style);
·
Strengthening of Lower-Hall ceiling as advised by
expert civil engineers and architects;
·
Semi-permanent wooden division of rooms into
cabins for research and academic personnel;
Financial resources to the tune of Rs. 2.5 million have
already been spent on the foregoing renovations/alterations/additions.
Nevertheless, according to estimations a similar amount is further required to
complete the work of providing for sufficient physical infrastructure and for
the immediate physical upkeep of the building.
Details of updated future requirements are provided on the
attachment. For the purpose of an accurate presentation of these requirements,
the attached document shall be continually and immediately (within 24 hours)
updated to present the latest and up-to-date picture of these requirements.
All those who wish to make a Sadaqah e Jaariyah
(perpetuating charity) in any of these projects may do so by contributing any
amount through checks, bank drafts or pay orders to the credit of 'Al-Mawrid',
which may be sent to:
Al-Mawrid (Contributions)
51-K, Model Town
Lahore, Pakistan
You may also make your contributions through credit card
using our online secure server.
Help us – in the way of the Sustainer of the Universe, the
most Gracious – organize Al-Mawrid as a modern-day research and communications
institute for the promotion and sponsorship of scholarship in Islam and,
thereby, presenting the teachings of Islam in a format that is in keeping with
the requirements of the present times.
Estimated Financial Requirements
for Development/Improvement/Maintenance of Physical Infrastructure & Office
Equipment at Al-Mawrid
|
Item |
Estimated Cost (Rs.) |
Total (Rs.) |
|
Construction, Furnishing & Equipment of Studio |
5,000,000 |
5,000,000 |
|
Construction of New Cabins (Scholars) |
150,000 |
5,150,000 |
|
Air
Conditioning |
150,000 |
5,300,000 |
|
Furniture & Fixtures |
200,000 |
5,500,000 |
|
UPS
for Computers |
225,000 |
5,725,000 |
|
Library Fixture
Polish |
150,000 |
5,875,000 |
|
Library Air Conditioning |
200,000 |
6,075,000 |
|
False Ceiling for
Library |
50,000 |
6,125,000 |
|
Staircase Railing (wooden railing, including polish) |
100,000 |
6,225,000 |
|
Driveway (Repair) |
150,000 |
6,375,000 |
|
External Maintenance of Building |
300,000 |
6,675,000 |
|
Fiber
Glass Structure for shading Prayer place (plus repair of floor) |
250,000 |
6,925,000 |
|
Telephone Exchange |
125,000 |
7,050,000 |
|
Repair of Main Entrance |
100,000 |
7,150,000 |
|
Furniture (including Library, Lobby, Reception etc) |
200,000 |
7,350,000 |
|
Miscellaneous |
150,000 |
7,500,000 |
For conversion of currency, please note that Rs. 58 amount to US $1.